Learn how to prepare a fair construction quote for RL, CSP and CSE activities, with cost items, responsibilities and a practical Excel template.

## How to prepare a construction quote for RL, CSP and CSE activities

How to prepare a construction quote for RL, CSP and CSE activities. Together with Dr Adriano Ciani, we examine quote templates with all the cost items to consider for a fair, well-informed offer. Attached you will find a pre-filled Excel file that can be quickly updated with all your duties and costs.

How to prepare a construction quote for RL, CSP and CSE activities

How to prepare a construction quote for CSP, CSE and RL



It was August 2006 when Decree Law no. 223, better known as the **Bersani Law**, **abolished minimum fees for engineers, architects, surveyors and technical experts**.



From that point onwards, an unusual market developed, with offers for technical services reduced so drastically that they sometimes no longer represented fair remuneration for the assignment undertaken. It became a market without rules in which, **despite the responsibilities established by law**, the Technician’s role was devalued in favour of the lowest price, to the detriment of quality.



> Result: an increase in disputes and public spending\!



So much so that in **June 2016**, the relevant Ministers took action by approving the decree containing “the remuneration tables”, proportionate to the quality level of design services and activities and to the activities referred to in **[Article 31, paragraph 8, of Legislative Decree 18 April 2016, no. 50](https://www.codiceappalti.it/DLGS_50_2017/Art__31__Ruolo_e_funzioni_del_responsabile_del_procedimento_negli_appalti_e_nelle_concessioni/8399)**, concerning the “**Public Contracts Code**”, since Public Administrations were no longer even able to assess the fee to be used as the tender starting price for service contracts.



> But minimum fees remain abolished to this day, both in the public and private sectors



## How to prepare a construction quote for RL, CSP and CSE: correctly pricing the offer



Let us come to the heart of today’s topic: **how to price your financial offer quickly, but above all on an informed basis**, in relation to the obligations under Articles 90, 91 and 92 of Legislative Decree 81/08 and subsequent amendments, for the activities of RL – **Responsabile dei Lavori (person responsible for the works)**, CSP – **Design Coordinator**, and CSE – **Execution Coordinator**.



> In this regard, Dr Adriano Ciani provided us with a useful Excel-based digital tool for related services lasting up to 13 months



## How to complete the construction quote for RL, CSE and CSP



- **[Download the Excel file to complete your construction quote](/media/downloads/a4072075-cf85-5c95-8ce4-1c24acbe4883)**


- The file lists, chronologically across the different sheets, the **duties to be carried out**


- **By completing the areas highlighted in green**, you can then quantify the direct costs you will incur and establish fair remuneration, meaning the best offer to formalise with the Client


- The Excel sheet is **able to create** its own / **customised company cost parameters**



## Quote for the Design-phase Coordinator



In summary, **the CSP** must draw up/prepare:



1. The initial information - PI (only for Public Works).
2. [**Assessment of the risks posed by unexploded ordnance**](/en/blog/safety-coordinator-unexploded-ordnance-risk) with a preliminary study – **[VOB](/en/blog/safety-coordinator-unexploded-ordnance-risk)** (only for works involving excavation).
3. The **Safety and Coordination Plan** (PSC), including the Layout, Estimate of Safety Costs, Programme, Labour Incidence and Operational Technical Sheets.
4. The File containing the **Characteristics of the Work** – FdO (not for ordinary maintenance works)
5. **[The Roof Technical Document](/en/blog/italian-roof-technical-document-etc)** – [**ETC**](/en/blog/italian-roof-technical-document-etc)
6. Work with the Designer to align the PSC with the **[Executive Project (Progetto Esecutivo)](/en/blog/the-construction-project)**.



## Quote for the Execution-phase Coordinator:



**The CSE** must carry out the following activities:



1. Check the PSC drawn up by another CSP and/or, where necessary, make amendments to the PSC, the FDO and the **[ETC](/en/blog/italian-roof-technical-document-etc)** (where applicable, namely in the case of roofing works)
2. Carry out periodic inspections/**[site visits](/en/blog/site-inspection-report-what-it-is)**
3. Check the **Operational Safety Plan** (POS) of the Appointed Contractor and verify that the POSs of the Executing/Subcontracting Companies are consistent with that of the Appointed Contractor and with the current PSC
4. Provide **consultancy to the Responsabile dei Lavori (person responsible for the works)** (if requested under the assignment)



## Quote for the Responsabile dei Lavori (person responsible for the works): activities to be priced



In summary, the **Responsabile dei Lavori (person responsible for the works)** must:



1. Carry out the **verification of the professional and technical requirements** of the Appointed Contractor and Executing Subcontracting Companies, whether or not subcontractors, as well as Self-Employed Workers – L.A. on site;
2. Prepare and submit the **Preliminary Notice** and related updates within the statutory deadlines.
3. Fulfil the requirements set out in **Articles 90, 93, 99 and 101 and Annex XVII of Legislative Decree 81/08** and subsequent amendments.



## Other expenses to consider when preparing a quote



How do you prepare a construction quote? As we have seen, the activities of the CSP, CSE and RL are **specialist technical activities involving significant responsibility** and are therefore all subject to general practice expenses, such as insurance policies:



- Professional indemnity insurance (mandatory)


- Legal protection (optional)


- Contractual expenses


- Office operational support services


- Notarial expenses for establishing an RTP (professional grouping)