# Control hours and costs on construction sites \| Mela

Source: https://www.mela.work/en/blog/construction-worked-hours-cost-tracking

Language: en

Learn how to track hours worked and labour costs on construction sites, avoid paperwork and anticipate deviations with a digital solution from Mela.

## How to control hours worked and costs on construction sites?

One of the factors that most affects the profitability of construction works and projects is the number of hours worked: the hours invested in carrying out a phase, an activity or an entire project. Labour costs, together with material costs, require monitoring and control, which is now very easy to achieve thanks to digital tools. You can keep track of this every day and anticipate possible deviations. This article explains how.

How to control hours worked and costs on construction sites?

CONTROL OF HOURS WORKED ON CONSTRUCTION SITES



***Contents***



## 1. Introduction



First of all, it is important to clarify that this article does not refer to recording working hours or **timesheets**: what we know as **clocking in**; in other words, recording staff members’ arrival and departure times at construction sites. We promise that this topic will be covered in another article in the not-too-distant future.



Because of its importance for profitability and efficiency, today we will discuss **recording hours worked on construction sites** and how, through [Mela](/en)-, we provide **simple and useful** tools that will allow us, at the end of each working day and jointly with all the parties involved in the project, to **monitor practically in real time** how many hours staff have worked, whether there have been deviations caused by unforeseen events or other reasons, and thus **anticipate and correct those deviations.**



## 2.Disadvantages of recording and monitoring hours worked on construction sites in paper format.



It may seem obvious, and to some extent it is, but in our experience, listing the advantages or disadvantages of something that is evidently clear helps us assess it from every angle and can give us a surprising overall view.



It is true that, until the emergence and development of the digital world, there were few alternatives to the traditional notebook and pencil or biro. Let us remember that many companies installed machines with those cardboard cards and a compartment beside them bearing each employee’s number. The card had to be inserted and, in many cases, a button or push-button had to be pressed to record the arrival time and subsequently the departure time. **This method did not guarantee the calculation either**, which had to be done by hand. It was really a system for recording presence, a clocking-in system.

Old time-recording or clocking-in machine

*Source: \*[https://es.wikipedia.org/wiki/Reloj\_de\_fichar\#/media/Archivo:2005-11\_stempeluhr.JPG](https://es.wikipedia.org/wiki/Reloj_de_fichar#/media/Archivo:2005-11_stempeluhr.JPG)*



Although machines were subsequently introduced that could subtract the arrival time from the departure time and thus “calculate” the length of stay—that is, the hours worked—we should not forget that these were offices attended by staff every day.



But those of us who work in construction know very well that **mobility is an essential part of our work.** The very nature of our work requires constant travel because of the location of construction sites or the trades and professions involved. What happens when, for example, an electrician works during **one working day** on more than one site being carried out by the same company or by more than one company? Until very recently, as we have already mentioned, records were kept on paper.



However, paper records have at least the following disadvantages:



- The first is the **time that elapses** between the end of the **hours worked** and the **accounts** team finding out the total. The next day? Weekly? Does the employee or someone from accounts need to travel to the office or the site, respectively? When will the authorised decision-makers be able to correct possible deviations that threaten the planning of the hours needed to complete the tasks according to the budget agreed with the client?


- The **risk of misplacing or losing** the paper is high. It can also deteriorate.


- Transcribing what was written on paper into hours-worked control software is a way of duplicating or, in some cases, **tripling** the **time spent on this calculation**. From paper—on loose sheets or in a notebook—to an accounting record that is generally focused on individuals, a further entry in the project’s general records will very probably be needed. During this transfer, **a number might “go astray**”.


- Let us not forget that all paper must be stored and retained—sometimes for years—either to guarantee cost traceability or because of legal requirements. **Storage,** as we well know, **costs.**



We do not think it necessary to go into the disadvantages in any more detail. Let us settle for a couple more questions: what happens if we need to locate a specific project with execution phases separated over time? What happens if we need to share, send or present to an inspector the hours worked by an operative, on a project or during a given period? More paper?



## 3.Digital solutions for recording and monitoring hours worked on construction sites.

Digital solutions for recording and monitoring hours worked on construction sites

The first temptation is to write the opposite of what was described in “2. Disadvantages of recording and monitoring hours worked on construction sites…” but we will not give in to it.



Instead, let us exercise our imagination:



1. Imagine that, after completing a task or activity, each employee records the number of hours spent carrying it out. It does not matter that the working day has not ended. Imagine it is 10:00 and an employee has finished installing the taps in a bathroom.
2. Imagine that they have done so on site; **using their mobile phone**. In an **easy and intuitive** way, they have opened the relevant project, found the task assigned to them that morning and entered that they spent 2,5 hours on it.
3. Imagine that this information about hours worked has a **cost per hour** that we previously entered and linked to the worker and that, after the worker saves the information, that cost is **automatically associated with the project** and can be viewed either by the worker’s name, by project or by the relevant day.
4. Imagine that with a single click you can generate a **PDF or Excel report** containing not only those 2,5 hours but **all the hours worked by that employee during the month**, and that you can share the report directly in the project chat with everyone, only with the accountant or send it by email to whoever needs it.
5. Imagine that at any time, simply by moving through a **calendar**, you can obtain the hours worked and their associated cost for a worker, **a project**, a project phase or by selecting a date range.



## 4. Mela is the solution.



We took into account the entire exercise in imagination we have just carried out together when designing the features provided by [Mela](/en) for recording and monitoring the hours worked by employees on construction sites. **An application designed specifically for the construction sector.**



**In this video, which is less than 3 minutes long, we explain how to record and monitor hours worked simply and intuitively:**

## Article video

**And in this one, lasting barely a minute and a half, we explain how to generate and export work reports for projects:**

## Article video

## 5. Conclusions



Choosing a **digital system** with **secure cloud storage** for **recording and monitoring** hours worked on construction sites—such as the one we offer through [**Mela**](/en)-instead of traditional, inefficient paper-based control or scattered use of other applications, can **make a difference** to the **time and costs** involved in this management.



The reduction in time and effort spent recording both the total and the cost of hours worked will **have a positive effect on the financial results** of companies and installers that **choose an integrated digital solution** such as the one offered by [Mela](/en).



The ability to obtain, with **just a few clicks and in almost** real time, all the information relating to **hours worked and their associated costs** in **reports** that can be **shared** both inside and outside the application in an **easy and intuitive** way frees up time and effort for **more effective management**, helps **reduce costs** and makes it possible to **anticipate** and **make decisions** about **potential deviations** from the initial forecasts.