# Site handover report: example and guide \| Mela

Source: https://www.mela.work/en/blog/italian-works-handover-report-example-guide

Language: en

Learn what a site handover report contains, who prepares it and how to complete it digitally with Mela, including practical examples and a checklist.

## Site handover report: example and completion guide

In construction, efficient management is crucial. 2023 has brought important innovations to this sector, from the widespread use of augmented reality to process digitalisation, with the aim of simplifying and improving project management. In this article, we offer a practical guide to preparing a site handover report. But how can we simplify its completion? Let’s find out together\!

What is a site handover report and how is it completed in 2023

What is a site handover report and how is it completed in 2023



***Table of contents:***



## Introduction to the site handover report



### What is a site handover report and why is it important in construction?

What is a site handover report for the works manager and contractor

The site handover report *is an important legal document* that officially records the temporary handover of the construction site to the contractor or [*contractor*](https://www.wikilabour.it/dizionario/appalto-somministrazione-esternalizzazioni/appaltatore/#:~:text=Definizione,-In%20alto&text=L'appalto%20%C3%A8%20il%20contratto,verso%20un%20corrispettivo%20in%20denaro.). This document is prepared before the works actually begin and involves the client ([*contracting authority*](https://contrattipubblici.org/glossario/stazione-appaltante/)) and the contractor (the executing company). *It has several legal implications and marks the transition from the [design phase](/en/blog/the-construction-project) to the execution phase.*



Its accuracy and completeness are essential for avoiding ambiguity and providing a sound legal basis for the continuation of the project.



In short, the site handover report is a fundamental tool that establishes the operational and documentary foundations of a construction project by recording the actual start of the works, the site’s initial conditions, the parties’ responsibilities, the prevention of future disputes, site approval and acceptance, quality and safety control, any contractual variations, and compliance with regulations.



> Careful preparation of the site handover report is essential, as this document ensures effective, transparent and regulation-compliant site management



### But how does the handover of the works take place?



The procedures for handing over the works are governed by the [\_Italian Codice degli appalti (Public Contracts Code; this year, Legislative Decree 36/2023)](https://www.bosettiegatti.eu/info/norme/statali/2023_0036.htm), which states that the works manager, on the instruction of the single project manager (RUP), is the reference person for this important act at this stage.



The works manager gives the contractor adequate notice of the day and place of handover. *Signing the site handover report officially records the handover.* It must be signed by both parties.



Now that we have clarified what a site handover report is and why it is considered so important, *it is also useful to briefly explain the difference between a works handover report and a works start report.*



### Differences between a works HANDOVER report and a works START report



The site handover report is prepared before the works actually begin and focuses on the temporary physical handover of the site to the contractor, whereas the works start report is prepared during the start-up phase and focuses on the official beginning of the construction activity. A works start report may also be used for private contracts, or rather private construction projects, although whether it is mandatory may vary according to local legislation. Nevertheless, many parties involved in private construction projects choose to use this type of documentation for greater transparency and efficiency and to avoid future disputes.



***After this brief overview, we come to the central point of this article.***



## What does a site handover report contain?

What does a site handover report contain

*The specific content of a site handover report may vary according to the project’s specific requirements, contractual provisions and local regulations.* For these reasons, if you search online for a standardised site handover report template, you will find several examples, all equally correct but structured differently and adapted to particular needs. However, there are fundamental and essential elements that must be included in a site handover report.



### Guidelines for correctly drafting a site handover report



Let’s look at some specific information that must not be omitted from the report:



***1-General information:***



- The date from which the works begin and the number of days contractually allowed for delivering the completed work.


- Identification of the works manager and contractor (executing company)



***2-Confirmation of site acceptance:***



- Confirmation that the site has been handed over to the contractor in accordance with the contractual conditions



***3-Site conditions:***



- Description of the site’s initial conditions at the time of handover, including regulatory compliance and any safety checks, as well as checks of measurements, setting-out and anything else required



***4-Document verification:***



- Confirmation that all documents required to start the works have been received, such as designs, technical specifications and authorisations



***5-Photographic documentation:***



- Photographic attachments documenting the site’s initial conditions, where necessary



***6-Signatures of the parties involved:***



- Signatures of the interested parties confirming receipt and acceptance of the site conditions



***7-Declaration of regulatory compliance:***



- Declarations confirming that the site complies with local regulations and contractual provisions



At this point, we have seen what a site handover report is, how it differs from a works start report, and which elements must not be omitted from this document.



**Now let’s understand how a site handover report is completed and who prepares it**



In the next section, we will also provide downloadable sample templates for site handover reports, to explain the concept covered even more fully and clearly.



## How is a site handover report completed and who prepares it?



**Completing a site handover report requires precision and care.**

How is a site handover report completed and which professionals are involved

### Identifying the professionals involved in preparing the site handover report



Several professionals are involved in the site handover report, each with specific roles in the process. The [works manager](https://biblus.acca.it/direttore-dei-lavori/#:~:text=Il%20direttore%20dei%20lavori%20%C3%A8,le%20opportune%20istruzioni%20quando%20necessario.) prepares the report and coordinates the physical handover of the site; the client may be involved in reviewing and approving the report where necessary; and finally there is the executing company.



> The works manager certainly plays a central role in this process



***The works manager’s stages are as follows:***



- **Communication with the contractor:** the works manager communicates with the contractor to coordinate the site handover and establish the date and place of the process.


- **Preparing the report:** the works manager prepares the site handover report, documenting the site’s initial conditions, the resources supplied and other important information identified above.


- **Signing the report:** once the contractor and works manager have checked and agreed the conditions, both parties sign the report, thereby confirming their acceptance.



### Guide to completing the site handover report



As stated above, the person responsible for preparing the site handover report is the works manager. They must take the greatest care to include all the necessary information.



***But what information is this?***



Below is a useful checklist to guide completion of the report. These key points can provide a solid starting point and can, of course, be adapted to the project’s requirements.



**Checklist for completing the site handover report:**



**-Preliminary information:**



- *Header:* enter the details of the client organisation or contracting authority


- *Project details:* specify the project name, contract number and all other identifying information.



**-Parties involved:**



- *Works manager:* clearly state the manager’s full name and contact details


- *Contractor:* provide detailed information about the contractor, including contact details



**- Date and place of handover:**



- *Date*: record the exact date of the works handover and their expected completion date


- *Place:* specify the place of handover clearly and in an identifiable way



**- Initial site conditions:**



- *Description:* detail the site conditions at the time of handover, including aspects relevant to safety and compliance



**- Materials and equipment:**



- *List of materials:* list the materials supplied during handover, where necessary


- *Equipment:* specify the equipment supplied for the works, where necessary



**- Setting-out and design:**



- *Plans and drawings:* ensure that the contractor has access to the project plans, profiles and drawings


- *Setting-out procedure:* detail the works setting-out procedure, where necessary



**- Signatures of the parties:**



- *Works manager and contractor:* obtain the signatures of the works manager and contractor to confirm handover and acceptance of the conditions



**- Photographic documentation:**



- *Attach photographs:* where appropriate, attach photographs of the site at the time of handover



After entering all the information described, it is also useful to supplement the report with details of charges and expenses, deadlines and contractual terms, any contractual conditions or variations, questions and answers from both parties to ensure greater transparency and clarity, and finally a review to avoid errors of any kind.



***So what should a site handover report look like?***



Below, we attach some templates found online, for greater clarity.



The templates we provide do not follow a specific standard and will therefore show slight differences, but they serve the same purpose and share the common denominator of containing the essential information.



### Downloadable site handover report templates



Here are some examples of site handover reports found online and available to download:



[*Full downloadable template from Studio Petrillo*](https://www.studiopetrillo.com/verbale-consegna-lavori.html)

Example site handover report from Studio Petrillo

[*Full downloadable template from Accasoftware*](https://biblus.acca.it/verbale-di-consegna-dei-lavori/)

Example site handover report from Acca Software Primus

[Full template from Edilbuil.it](https://www.edilbuild.it/wp-content/uploads/2015/02/Processo-verbale-consegna-lavori.doc)



So far, we have identified all the crucial aspects that enable us to prepare a report, the professionals involved and the content that must be included.



***But the question I find myself asking is:***



> Are there ways to shorten the drafting and completion time of a site handover report and, above all, ensure greater security and transparency over time?



## New features in the digital site handover report in 2023



In construction, [*digital innovations*](/en/blog/the-digital-construction-site) are becoming increasingly important, introducing new tools and approaches designed to improve efficiency, safety and quality of work.



All these innovations aim to solve specific challenges in the sector and promote more efficient work.

Digital innovations in construction

### Description of new trends and technologies in construction



Among the innovations affecting construction and becoming increasingly established in 2023 are technological and digital developments. For example, the forthcoming [\_update to the Italian testo unico dell’edilizia (consolidated building regulations; DPR 380/01)](/en/blog/italy-building-code-dpr-380-2001-reform), expected at the beginning of 2024, discusses a digital file, while the [\_new Italian Codice degli appalti 2023 (public contracts code; Legislative Decree 36/23)](/en/blog/italian-public-procurement-code-2023-key-changes) sets out new digital standards.



This transition from a traditional to a technological model is now considered necessary for construction too. Those working in this field should embrace innovation to keep up with the times, reduce the complexity of their work, speed up standard procedures, and achieve greater security and transparency.



We have certainly all heard of BIM, augmented and virtual reality, mobile and cloud applications, and blockchain in construction, and how these tools can improve operational efficiency and workplace safety and deliver qualitative and quantitative improvements in everyday work.



***But let’s come to the key point of our article.***



> How can these digital innovations also be used in a site handover report?



### Digital innovations can make preparing a site handover report easier



The steps involved in preparing and completing a site handover report, as described above, are traditional ones. Put simply, the works manager prepares a report containing the necessary information, which is then completed and signed by the parties involved.



So far, everything is clear. *However, there is a way to speed up these mechanical, repetitive operations and make them more secure.*



***How?***



***Through digital technology\!***



Before explaining how digital technology can be integrated into the site handover report process, it is important to understand why ***in 2023 we should move away from a traditional system and adopt more efficient, innovative practices.***



### Greater reliability, transparency and security than paper



Moving from a traditional system for completing a site handover report to a digital system offers several significant benefits.



*Let’s look at them in detail:*

| Criterion | DIGITAL | TRADITIONAL |
| --- | --- | --- |
| Reliability and accuracy | More accurate information recording and fewer errors | Transcription and interpretation errors may occur |
| Transparency and accessibility | Information accessible in real time to all parties involved | Takes longer to deliver and limits immediate access to information |
| Information security and integrity | Blockchain technology ensures the security and integrity of recorded data and provides complete traceability | Paper documents are more susceptible to loss, damage or alteration |
| Speed and operational efficiency | Speeds up the process, enables a faster workflow and reduces time spent on documentation | Managing paper documents takes longer and slows down the overall process |
| Saving time and resources | Reduced need for physical resources and time savings | More time required to manage paper documents |

In short, moving to a digital system not only modernises the process of completing a site handover report, but also delivers a step change in efficiency, security and transparency.



***At this point, you may be wondering what digital solution could be adopted.***



The answer is very simple: **[*a mobile app integrated with blockchain\!*](/en/blog/blockchain-construction-mela-example)**



*And we have finally reached the final and crucial part of this long article: how to complete a site handover report easily, quickly and effectively\!*



## Digital solution: MELA, the app for completing a site handover report



### Introduction to the app and its benefits



We present a system capable of doing everything we have seen so far in just a few steps, in a completely secure and reliable way.



With the [Mela construction site app](/en), you can create your own report template, complete it directly on your smartphone and have all the people involved in the process sign it directly in the chat available within the app. And that’s not all\!



As mentioned above, the Mela app uses the unalterability and transparency of [Blockchain technology](/en/blog/construction-blockchain-report-notarization) to save and manage site handover reports, so that they are visible and verifiable by all parties involved or by third parties, such as a solicitor. For the [Works Manager](/en/blog/construction-project-director-report-templates), blockchain provides an additional guarantee of the verifiability and immutability of the reports, which can be saved and shared with the executing company or end client on distributed ledgers.



***Let’s look in detail, through a step-by-step guide, at an example of how you can complete a site handover report using the Mela app.***



### Detailed steps for using the MELA app to complete the site handover report



- First, download the Mela app and register with your credentials.

1 DIGITAL SITE HANDOVER REPORT COMPLETION

- Once inside the app, click the ***“+ new activity”*** button and enter the project name, or whatever you feel best identifies your activity.

2 DIGITAL SITE HANDOVER REPORT COMPLETION

- This creates your activity, which will be managed entirely within a chat. To start completing your site handover report, click the ***“+”*** button at the bottom left and select the task to complete that suits your needs; in this case, select ***“report”***.

3 DIGITAL SITE HANDOVER REPORT COMPLETION

- Select the document format you need and begin completing the fields with the required data.

4 DIGITAL SITE HANDOVER REPORT COMPLETION

- Click ***“save”*** and the newly prepared document will appear in your construction site chat. It is important to remember that all the people involved can access this chat. You can then attach photographs, if necessary, taken directly on site or selected from your smartphone gallery.

5 DIGITAL SITE HANDOVER REPORT COMPLETION

- Once you have finished, when you believe the document is ready and no further changes or additions are needed, you can sign it and have the other people involved sign it too within the app, simply by entering the names of the other signatories as shown in the image. Please remember that the signature has legal force.

6 DIGITAL SITE HANDOVER REPORT COMPLETION

- You have reached the end and completed your site handover report. If necessary, you can export it by clicking the three dots at the top right of the chat and then selecting ***“export”***.

7 DIGITAL SITE HANDOVER REPORT COMPLETION

- You will now also have a PDF document that you can save and share with anyone who needs it.

8 DIGITAL SITE HANDOVER REPORT COMPLETION

## Conclusions:



We have reached the end of this long guide to the site handover report process. I hope I have provided all the information you needed and clarified this vitally important document.



We began by explaining what a site handover report is, then looked at the professionals involved in the process and all the information it must contain. We then provided examples to clarify how a report should be prepared, and finally saw how this process can be managed easily through digital technology and what benefits innovative management can bring to construction.



If you work in construction and are interested in discovering the many other benefits you could bring to your daily work, I invite you to download [*the Mela app*](/en) and try the product yourself.

## Article video