# Digital Site Diary: App and Software \| Mela

Source: https://www.mela.work/en/product/construction-daily-log

Language: en

Create a digital Site Diary with Mela. Organize activities, photos, daily reports and minutes, sign the document and export it as a PDF from the site or office.

## Digital Site Diary, always up to date with Mela

Document everything that happens on site, day after day. With Mela, collect activities, photos, daily reports, minutes and updates directly from the field and organize them in the digital Site Diary. Review the information, sign and export the document as a PDF, without having to reconstruct each day from spreadsheets, chats and notes.

- [Request a demo](<https://www.mela.work/en/contact>)
- [Try Mela for free](<https://www.mela.work/en/try-mela>)

## From work on site to the Site Diary, everything with Mela

WHAT CHANGES WITH MELA’S SUPPORT

Every day brings work activities, personnel, photos and information that need to be documented. With Mela, field workers record updates directly from the app, while Site Supervision can review and add to them and use them to compile the digital Site Diary.

1. Record activities — Teams and site managers — Enter updates on the work and activities carried out during the day.
2. Document the work — Directly from the field — Add photos, daily reports, documents and useful information.
3. Organize the day — Data collected with Mela — Updates help build the site timeline.
4. Review the information — Site Supervision — Review notes, add observations and complete the diary.
5. Sign and share — Site Supervision and office — Sign the document, export it as a PDF and make it available to authorized users.

## How to create and manage the Site Diary with Mela

ALL THE FEATURES FOR ON-SITE OPERATIONS

From collecting information to signing the document, Mela simplifies the preparation of the Site Diary. Record activities and updates directly from the field, link photos and daily reports to the project, and organize information chronologically. Site Supervision can review and complete the diary before sharing it.

## Everything that happens on site, recorded day by day

STEP 1 \| RECORD SITE UPDATES

Work activities, team attendance, materials, equipment, weather conditions and unforeseen events: each day contains important information for documenting the progress of the work. With Mela, you can collect updates directly from the app through messages, notes, photos and daily reports linked to the site. The information remains organized in the project timeline, so you do not have to retrieve it later from notes and conversations. Benefits:

Smartphone recording daily work activities, personnel, equipment and operational information in the Mela Site Diary.

- Record activities, updates and observations directly from the field.
- Keep information linked to the site and the working day.

## Every piece of information in the right place, without re-entering anything

STEP 2 \| LINK PHOTOS, DAILY REPORTS AND DOCUMENTS

A complete Site Diary contains more than just a description of activities: it should make it possible to reconstruct what happened during the work. With Mela, you can link photos, daily reports, minutes and documents already collected in the field to each site day. The information is organized in the project timeline, helping document progress, work activities and significant events. Benefits:

Mela dashboard with a daily timeline of completed activities, documents and photos associated with the site.

- Link photos, daily reports and minutes to the daily documentation.
- Reconstruct the history of work activities in one place.

## From recorded activities to an already organized document

STEP 3 \| PREPARE THE DIGITAL SITE DIARY

Preparing the Site Diary should not mean rewriting all the information collected during the day. With Mela, you can use project updates to generate the digital Site Diary, with notes arranged chronologically and linked documentation. You can review the content, add any missing information and prepare the document for review by Site Supervision. Benefits:

Mela interface for reviewing and checking information recorded in the digital Site Diary.

- Generate the Site Diary from data already collected on site.
- Organize notes in a document that can be viewed and exported.

## The Site Diary is ready, including for those working in the office

STEP 4 \| REVIEW, SIGN AND SHARE

Once prepared, the Site Diary can be reviewed and completed by Site Supervision with the necessary observations and notes. With Mela, you can collect signatures using the available features, export the document as a PDF and share it with the project manager, contractor, technical office and other authorized users. The diary remains digitally archived and available whenever needed. Benefits:

Mela platform with a preview of the Site Diary and the feature for exporting the document as a PDF.

- Review, sign and export the Site Diary as a PDF.
- Share the document and maintain an organized project history.

## Explore all the features related to daily reports

All the features for on-site operations

### Exports and reports

Export data to PDF or Excel and share site reports.

Exports and reports

[Learn more](<https://www.mela.work/en/product/construction-reports-and-data-export>)

### Geotagged photos

Archive photos with date, location, author and construction site.

Geotagged photos

[Discover more](<https://www.mela.work/en/product/construction-photo-archive>)

### Voice site reports

Dictate activities, hours and materials: AI prepares the site report.

Completed site report

[Find out more](<https://www.mela.work/en/product/construction-daily-reports>)

### Sign blockchain

Sign with blockchain and verify document integrity.

Blockchain signing

[Learn more](<https://www.mela.work/en/product/blockchain-signature>)

### Measurement books

Link measurements and quantities to the takeoff to prepare progress reports.

Measurement books

[Learn more](<https://www.mela.work/en/product/construction-measurement-book>)

### Site inspection reports

Create and share site reports with photos, attachments and signatures.

reports

[Discover more](<https://www.mela.work/en/product/construction-site-reports>)

### Progress reports and payment certificates

Turn measurements into progress reports and payment certificates.

Progress reports and payment certificates

[Discover more](<https://www.mela.work/en/product/work-progress>)

## Why use Mela’s digital Site Diary?

### You do not have to reconstruct the day

Collect updates, notes and activities directly during the work, without waiting to return to the office.

### Photos and daily reports in one place

Information collected in the project helps create more complete daily documentation.

### Every day documented

Review notes, collect the required signatures and keep the Site Diary’s digital history.

### Keep working in the field

Collect and save information with offline support, then synchronize it when the connection becomes available again.

## Digital Site Diary: what changes with Mela compared with paper and Excel?

LESS TRANSCRIPTION, MORE DOCUMENTATION

| Activities | Without Mela | With Mela |
| --- | --- | --- |
| Information collection | Notes, messages and updates to retrieve at the end of the day | Activities and notes recorded directly from the site |
| Daily preparation | Information to copy manually into a logbook or Word file | Digital Site Diary created from data collected in the project |
| Photos and documentation | Images and documents scattered across folders and conversations | Photos, daily reports and minutes linked to the site |
| Work history | Notes to reorder and check manually | Information organized by day and activity |
| Review and signature | Documents to print or send for signing | Review and signature collection through Mela’s digital tools |
| Export and sharing | Files to format and distribute manually | Site Diary that can be exported as a PDF and shared with authorized users |

## What is the challenge on your site?

Ask Mela Brain

AI recommends the Mela features that are right for you.

## Describe the challenge on your site

### Example questions

- I have several sites and teams to coordinate
- I waste time on daily reports and minutes at the end of the day
- I want to keep site costs and margins under control
- I need to manage safety, PSC/POS and worker ID cards

## Here’s what people who manage construction sites with Mela have to say

Site stories

Owners of construction companies, site managers, workers and site supervisors share how the Mela app and Mela Brain help them save time every day, control costs and work progress, and keep site documentation organized.

## Testimonials

> Finally, the control that gives me the ability to plan for the future

— Vito F., Construction company owner · Rome

> Everything I have in the office is now on Mela

— Stefano, Site technician - Como

> Work activities, hourly labour costs and progress reports. With Mela, I finally have everything under control

— Giulia S., Co. San. srl - Construction company - Palermo

> Thanks to the integration with WhatsApp, the workforce can easily share information

— Leonardo, Engineer and Project Manager

[Read the site stories](<https://www.mela.work/en/case-study>)

## Frequently asked questions about the construction site management app

FAQ

## Frequently asked questions

### What is the Site Diary and what is it used for?



The Site Diary records, in chronological order, the activities and significant events that occur during the execution of a project. It is used to reconstruct the progress of the construction site and support technical and documentary checks.



### How can you fill in the digital Site Log with Mela?



With Mela, you can collect site information and updates and use them to fill in and consult the digital Site Log. Activities, photographs and documents remain associated with the project and can be checked by authorised users.



### What information should be entered in the Site Diary?



The Site Diary may include completed activities, operating conditions, the presence of personnel and equipment, significant events, observations, and document references, according to the project requirements and the rules applicable to the contract.



### Can photos and documents be attached to the Site Journal?



Mela allows you to collect photos and documents within the project, making it easier to consult the supporting documentation for updates to the Site Journal.



### Is it possible to export the Site Diary as a PDF?



Mela provides tools for viewing and exporting construction site documents, including the Site Diary. Before official use, it is necessary to verify that the document contains all the elements and signatures required by the contractual context.



## Download the Mela construction site management app

Download · iOS and Android app

Available for iOS and Android · Take Mela with you on site.

## Downloads

- [Download on the App Store](<https://apps.apple.com/app/mela-works/id1481842075>)
- [Get it on Google Play](<https://play.google.com/store/apps/details?id=com.mela>)
