Direct award under the new Public Contracts Code

What is direct award and what does it provide? Let’s explore the changes introduced by the new Public Contracts Code, what the rules on Direct Award provide and what changes on construction sites. The world of construction and building-site management is a structured and complex environment governed by rules designed to optimise the sector’s efficiency, ensure its effectiveness and safeguard its functionality. Many laws and regulations are issued to ensure that every aspect is regulated and that each activity has operating procedures capable of delivering a high level of quality while protecting workers’ safety. When dealing with public works and contracts, it is also essential to safeguard clarity and transparency and to ensure that procedures comply with rules that are equally valid for everyone.

Worker using a drill

What is the Public Contracts Code?

One development that has profoundly changed the world of public contracts, bringing about a major transformation, is the entry into force of the new Italian Public Contracts Code (Codice dei Contratti Pubblici), Legislative Decree 36/2023.

In force from 1 July 2023, the text was created with the specific aim of simplifying procedures, encouraging participation by businesses – particularly small and medium-sized enterprises – and making the entire system more efficient.

What are the different parts of the Public Contracts Code?

The Code is divided into five main parts:

  • General principles and digitalisation, which establishes the fundamental principles and promotes the use of digital tools in procurement procedures

  • Contracts and procedures, which governs contracts for works, services and supplies

  • Contracts in special sectors, which covers contracts in the water, energy, transport and postal services sectors

  • Public-private partnerships and concessions, which regulates forms of collaboration between public and private bodies

  • Disputes and control, which addresses disputes and control mechanisms in the procurement sector

What are its guiding principles?

There are three main guiding principles that shape contracting authorities’ decisions: the principle of the result, which aims to achieve concrete value within set time frames; the principle of trust, which encourages a collaborative relationship between the Public Administration and economic operators; and the principle of access to the market, which is intended to promote competition and innovation.

Alongside these principles, a fundamental aspect is the decision to promote mandatory digitalisation: all stages of tenders must now be managed through IT platforms, ensuring traceability and transparency.

A significant change introduced by the legislation concerns the obligation to digitalise procedures at every stage of public procurement. Contracting authorities must use digital platforms to manage tenders, thereby ensuring the greatest possible transparency, traceability and efficiency.

In this context, the principle of direct award takes on even greater importance, enabling streamlined procedures while also requiring care, justification and compliance with the rules. Let’s now look in detail at what article 50 of the new code provides.

Direct award: what article 50 of Legislative Decree 36/2023 provides

Article 50 governs simplified procedures and identifies direct award as the preferred instrument for lower-value contracts.

The thresholds currently provided for are:

  • For works, direct award is possible up to 150.000 euros

  • For services and supplies, direct award is permitted up to 140.000 euros

A contracting authority can therefore award a contract falling within these limits without having to draft and publish a tender notice and without having to consult several operators, provided that certain principles are observed. These are set out below:

  • The reasons for choosing the successful tenderer must be stated explicitly

  • Their technical and professional suitability must be verified

  • The rotation principle must be observed, preventing repeated awards to the same operator unless adequate justification is provided

Although it is not formally required, it is nevertheless considered good practice to request at least two or three quotations, including by email or certified email (PEC), so that the procedure ensures transparency and traceability.

Who does the rule apply to?

As can already be inferred from the name of the rule, direct award, as defined by article 50 of the New Code, applies exclusively to public contracts. It is therefore valid for municipalities, regions, public bodies, healthcare organisations, central purchasing bodies and all contracting authorities within the Public Administration.

Private businesses, on the other hand, are not subject to these rules; however, they may choose to draw inspiration from them. The best practices introduced by the Code – including transparency, traceability and reasoned decision-making – are certainly three central aspects that can inspire any organisation, especially in structured contexts where efficiency and traceability in spending decisions are key elements.

What changes for people working on construction sites?

Article 50 creates important opportunities for the activities that businesses and technical professionals carry out in the field. Here are some of them in detail:

  • Greater speed in awarding works, particularly in urgent cases or when targeted interventions are needed

  • A lower administrative burden thanks to simplified procedures

  • Greater efficiency thanks to more straightforward operations and a reduced financial and economic burden

  • Increased transparency and traceability through digital platforms that provide greater visibility of procedures and decisions

  • Shared responsibility encouraged by the principle of trust and the creation of closer collaboration between contracting authorities and economic operators

How does site operations change?

For technical professionals, businesses and operational managers, direct award is now a strategic tool that enables works or supplies to be started quickly without the need to implement complex procedures. It is particularly useful for small-scale works and maintenance.

It must nevertheless be stressed that reducing the administrative burden must go hand in hand with greater rigour in carrying out the procedures: all documents produced during the process must be collected and retained so that the site can respond appropriately to any subsequent inspection to which it may be subject.

The importance of construction site apps

In this context, it is essential to be able to rely on digital tools that can provide valuable support in managing and organising work.

The Mela App is therefore the perfect choice for management based on the precise and timely organisation of documentation, the traceability of communications and the rigorous archiving of decision-making processes.

It is a technological tool that makes it possible to record, organise and retain all the information useful and necessary for the proper performance of construction-site activities, quickly and simply.

Conclusion

We have seen how direct award is one of the cornerstones on which the entire Public Contracts Code is based and an essential tool for making operations faster and more flexible.

Understanding its rules and regulations, and equipping oneself with the essential tools to benefit from them, is now a key requirement for all businesses that want to operate effectively and efficiently, in full compliance with the rules.

Try Mela for freeRequest a demo

Download Mela

Download on the App StoreGet it on Google Play

Written byAlessandro Cognigni