ART. 99 D.LGS 81/2008: preliminary notice
Learn when a preliminary notice is required on Italian construction sites, who must submit it, what it must contain and how Mela helps manage site work.
A preliminary notice is a document intended to inform the competent authorities that a new construction site is opening. It contains the most important details about the works to be carried out and the people involved. The requirement for a preliminary notice on construction sites was introduced to improve workplace safety and enable more effective supervision by the authorities. This article explains when it is required, who must prepare it and what information it must include.
ART 99 D LGS 812008 preliminary notice
What is D.LGS. 81/2008
The Decreto Legislativo (Italian Legislative Decree) of 9 April 2008, no. 81, known as the Consolidated Act on Workplace Safety, is currently the main legal reference governing health and safety in the workplace.
It coordinates and updates all the legislative provisions issued previously and aims to prevent worker injuries and ensure a safe working environment.
Among the obligations set out in the decree for temporary or mobile construction sites, the preliminary notice, governed by Article 99, plays a fundamental role.
What are temporary or mobile construction sites
Article 99 of D.LGS. 81/2008 specifically concerns preliminary notices for temporary and mobile construction sites.
For temporary and mobile construction sites, the Consolidated Act on Workplace Safety means indoor or outdoor workplaces where construction, maintenance or demolition works that are not permanent are carried out.**
Here are some examples:**
construction of buildings: homes, offices and industrial buildings
refurbishment and maintenance: façades, systems and roofing
excavation, demolition and earthworks
construction of roads, bridges and tunnels
installation of electricity lines or water networks
work on scaffolding and staging
They are defined as temporary because, however long the works may last, their duration is limited in time; they are mobile because they can move from one location to another.
What does Article 99 of D.LGS. 81/2008 provide
In brief, Article 99 of D.LGS. 81/2008 provides for:
the obligation for the client or project supervisor to send it to the competent authorities before work begins
the need to include precise and detailed information about the works and the site
the obligation to update it if the information changes during the works
the need to display the notice, which must be posted on the site and accessible to anyone responsible for safety matters.
When is a preliminary notice required
Article 99 of D.Lgs. 81/2008 identifies certain cases in which a preliminary notice is mandatory:
more than one executing company is present: when several executing companies are present on the same site, even if not at the same time, appointing a safety coordinator is mandatory
a site where a single company works but the estimated workload is equal to or greater than 200 person-days: this parameter refers to the number of workers multiplied by the planned working days
sites that were not initially subject to the requirement but where changes during the works result in the presence of several companies are subject to the obligation to submit the notice
When is a preliminary notice not required
There are some cases in which preparing and submitting a preliminary notice is not necessary:
if only one company operates on the site and the estimated workload is less than 200 person-days
if no changes occur that create the need to involve several companies
for certain routine maintenance works that do not require a significant workforce
Who must prepare the preliminary notice
The client or project supervisor is responsible for preparing and submitting the preliminary notice.
The client is the individual or legal entity on whose behalf the work is carried out. A project supervisor may be appointed and entrusted with handling the safety-related obligations.
What information must it include
Annex XII to D.LGS. 81/2008 specifies the data and information that must be included in the preliminary notice. They are as follows:
date of the notification
site address
client’s details, including first name, surname, tax code and address
nature of the work
project supervisor, if appointed
safety coordinator during the design stage, if appointed
safety coordinator during the execution stage, if appointed
estimated start date of the works
maximum estimated number of workers present at the same time
expected number of companies and self-employed workers involved
details of the selected companies
estimated total value of the works
How to submit the preliminary notice
There are several channels through which the notice can be submitted, and each client can choose the most convenient option from:
PEC, or certified email, a fast and secure method that ensures delivery within a short time and provides proof of submission
recorded delivery with acknowledgement of receipt, where required by local regulations
online portals of the ASL or Labour Inspectorates, where available in the relevant territories
Who must receive the notice
The preliminary notice must be sent to several recipients:
ASL, the local health authority with territorial responsibility
ITL, the territorial labour inspectorate
only for sites of particular importance for public order, the prefecture as well
What to do if the notice is updated
If significant changes occur during the works, such as:
the addition of new executing companies on the site
significant changes to the expected completion times or the scale of the works
a change of safety coordinator
the client must update the preliminary notice and send it again to the competent authorities.
What happens to those who fail to comply
Administrative and criminal penalties may apply to those who fail to submit the preliminary notice, or do not submit it within the required time or in the required manner:
administrative penalties: the client or project supervisor may be subject to a fine of between 1200 and 6000 euros
criminal penalties: in the most serious cases, this may result in arrest for a period of up to 6 months
suspension of the site: where considered necessary, the authorities may order the site to be suspended until the situation is regularised
Practical examples
Here are some examples to understand when preparing a preliminary notice is actually necessary:
a site where a single company works for fewer than 200 person-days: the preliminary notice is not required
a site where two or more companies take turns carrying out the works: the preliminary notice is mandatory
a site initially operated by a single company but later subcontracted to other companies: the preliminary notice must be updated and submitted again with the new documentation
How to optimise site work with Mela
Mela is an app that can transform construction-site management by digitising information, documents and processes.
It is an innovative tool for overseeing and monitoring works and tracking site costs directly from a smartphone. You can manage the site by taking photos and videos, completing work reports, keeping track of inspections and creating the site diary simply and quickly.
Conclusions
The preliminary notice is an essential document for protecting the safety of people working on construction sites and ensuring transparency towards the competent authorities.
Complying with this obligation and following the legislation carefully helps prevent workplace accidents and avoid administrative and criminal penalties. This is why clients and project supervisors must give it their utmost attention and ensure that this important document is prepared and submitted correctly.