How can you take on more projects without increasing your workforce?

It is widely accepted that materials and labour are the two main contributors to construction costs. The possibility of taking on more construction work and more projects does not necessarily depend on hiring more workers. Clearly, it does not depend on reducing material prices either, as that is beyond our control. Digitalising your construction processes with tools such as Mela, construction management software, will allow you to optimise your processes and projects by saving time, avoiding errors and making the most of your available human resources. We explain how.

Construction site with machinery

Contents

1. Introduction.

Traditionally, the construction sector has been reluctant to adopt new technologies, especially those related to digitalisation. In the 80s, the introduction of AutoCAD, despite its undeniable advantages, took nearly ten years. More recently, the adoption of BIM has shown similar behaviour in the sector.

Unlike in past decades, we are witnessing one of the most important changes in human history—without exaggeration: digitalisation. This phenomenon has gained so much ground and so many users that today it is genuinely difficult to avoid its uses, benefits and, of course, the problems involved in implementing new ways of working and managing different aspects of everyday life. Consider, for example, everything we now do with a mobile phone.

In the construction sector, a complex field in which both self-employed professionals and site managers, works managers, architects, building surveyors and others sometimes need to manage several projects being carried out simultane****ously or almost simultaneously; a sector facing a significant labour shortage, in which prefabrication is increasingly becoming a solution to several shortfalls, digitalisation is essential not only to become more efficient, reduce costs and increase profits, but simply to survive.

The three “sacred” variables in construction—Time, Cost and Quality—are already digitalised in an application such as Mela, conceived and designed from within the sector to address the needs of all the parties involved in the construction process with regard to project management and documentation, and to enable them to anticipate issues and act directly on these three variables. Let us take a look.

We are not in an era of change, but in a change of era characterised by the digitalisation of practically everything around us.

Emérito Martínez. Digital Business Transformation Leader at Themarketingmaps.

2. The Time variable in the digitalisation of construction projects.

The Time variable in construction is mainly associated—and rightly so—with meeting the deadlines agreed with the client. However, it is worth stressing that this is the endpoint. Before the full or partial handover to the client, there are many intermediate milestones on which meeting those deadlines depends. Client satisfaction and the reputation of the construction company or self-employed professional cannot be safeguarded without anticipating issues, especially in construction projects where many factors can affect schedules and not all are within our control.

What can we do from a digitalisation perspective to anticipate issues and complete the partial milestones that will guarantee not only the timely delivery of what was agreed, but also the optimisation of the operational time devoted to the work?

- Planning and risk prevention:

From the very beginning of a project, its different stages and activities or tasks should be detailed as thoroughly as possible. Efforts should be made to identify potential unforeseen events and draw up options or contingency plans.

Task allocation in Mela, with the person responsible and start and end dates and times, means that everyone involved knows exactly where, when and what actions they need to carry out. The application’s flexibility makes it easy to reformulate tasks as circumstances require. At the same time, it enables tasks to be reassigned in real time and shared immediately in the project chat with everyone involved.

The ability to create checklists, which can also be quickly modified to adapt them to reality, helps maintain an already tested sequence of execution, wherever possible, ensuring compliance with quality standards and helping to avoid errors that always require more time to redo work than was originally planned. This is especially useful with contractors, who are not usually familiar with our working processes.

- Communication and collaboration within the work team:

It may seem obvious, but in construction every minute counts. Everyone involved—from the architect, through the site manager, to the operative—is informed in real time about everything happening on site. The client can also be added to the project. In a housing development, for example, several Mela clients have included the developer in the project. A tagged and geolocated photo shared in the chat, followed by a voice or text message, will avoid more than one journey and ensure that decisions do not have to wait.

Sharing the project or tasks as if it were a standard messaging group strengthens communication and means that everything is recorded, organised and easily retrievable later in the application’s cloud. In our customers’ experience, rereading or reanalysing reported cases and problems thanks to the digitalisation of information has prevented many delays. From the perspective of optimising available human resources, the advantages are very clear. Don’t you think?

- Document management, minutes, reports and inspections:

We all know it is cumbersome, but unavoidable. Managing all the documentation required for a project in the traditional way and on paper takes those responsible away from what matters most: the project itself. This is another factor contributing to the lack of time, or to having to spend hours and hours, usually in the office, producing, reviewing, storing and safeguarding the documentation generated on site. Many documents must be kept for years, as required by law.

Aware of this situation, we have designed a system of templates in Mela for Minutes, Inspection Minutes, Setting-out Minutes and Works Certification Minutes—in short, the ability to:

a) Create templates quickly and intuitively for any documentation required periodically or, thanks to the application’s flexibility, for any one-off documentation.

b) Once the template has been created, fill it in directly from a mobile phone or tablet on site.

c) Thanks to Blockchain technology, the minutes can be signed with full legal validity by all parties involved without them having to be physically together. As the application makes it possible to add photos, voice-to-text messages, the company logo and contact details, and all the information shared on the project to the minutes, spending time creating the templates at the outset means considerable time savings later. The documentation generated is easy to locate in the future and can be searched using many criteria, including the project name, its geolocation or the title. Everything is stored in the Mela cloud without taking up space on your devices.

3. The Cost variable in the digitalisation of construction projects

We have already said that the main costs in the sector come from labour and materials. Similarly, we all know that our ability to react to mitigate or correct budget deviations will depend on how quickly we know the real situation of the projects in terms of costs.

Labour:

Closely related to planning in the Time variable, selecting the right staff in terms of numbers and skills is one of the key success factors. It is very common, for example, for an electrician to work on more than one project on the same day, and for the nature of their work on project 1, for example, not to be the same as on project 2. Naturally, the hours worked and the price of those hours vary.

Mela offers you these possibilities:

a) Daily clocking in from the application itself, including geolocation.

b) Monitoring hours worked on projects.

c) Automated generation of daily timesheets from daily clock-ins.

d) The ability to assign an hourly cost to each application user according to the project and the nature of the work they carry out on different projects.

Using these tools and subsequently analysing costs—people, materials, services, machinery and so on—will undoubtedly help refine labour costs based on the timesheet of hours worked.

Materials, services and machinery versus the budget:

As mentioned, although material prices have a significant impact on project costs, they are not within our control. Once the price of the materials and, where applicable, their delivery to the site have been agreed, what remains is, on the one hand, to compare progressive expenditure with the budget, while also analysing their optimal use on the projects.

Real-time monitoring of budget execution:

In Mela you can enter, by itemised categories, the available budget for each item. Materials, for example, can be entered from a standard template that can be enhanced and adapted to the specific materials being used. You can enter the material type, unit of measurement and unit price. Based on this information, if the budget has been entered beforehand, at the end of each working day, practically automatically, we can know the progress of budget execution, fully updated with the latest available data.

Automatic reading of delivery notes and invoices:

The Automatic reading of delivery notes and invoices feature not only saves you time and prevents errors: from a simple photo, using OCR technology (optical character recognition) enhanced with artificial intelligence, you obtain an accounting Excel file that allows calculations without manually transcribing its content. It also enables you to monitor in real time how much material arrives on site and its associated costs, both for the material and for transport when they come from two different suppliers.

4. The Quality variable in construction projects.

The Quality variable is closely related to the Time and Cost variables. If you think about it, the availability of time, or rather the effectiveness of its planning, directly affects delivery deadlines for the client, one of the main indicators used to measure quality in general. It goes without saying that, to achieve customer satisfaction, the first indicator is meeting the agreed deadlines.

Cost, influenced by the quality and price of the materials received, full adherence to the construction project, the proper management of available labour and, in short, the immediate communication of budget deviations, the order of the work execution sequence, and any unexpected situation that jeopardises compliance with time, cost and, therefore, quality standards, are vital elements, among others.

To this we should add the importance of maintaining a safe and healthy working environment to prevent workplace accidents, which have such a damaging impact on labour.

As we have seen, the features offered by Mela will help you manage your employees’ hours and clock-ins, together with their associated costs, as well as the materials and possible services—machinery, transport and so on—used on your projects.

Being able to focus on the challenges presented by projects every day, because you have automated your project document management, means you do not have to spend extra time, generally in the office, creating, issuing and safeguarding it. This allows you to properly supervise any deviation that occurs during the work before it is too late and it affects quality.

Mela can become, if you wish, an indispensable tool for controlling and supervising the quality of your projects, allowing you to monitor Cost and Time variables instantly, from the project itself, without the need to travel, and with a substantial improvement in internal communication between your work teams, between different work teams and even with the client.

5. Conclusion.

Honestly, there is no magic formula that allows you to optimise labour so that you can take on more contracts or new projects without increasing it. What we can assure you, because it is scientifically grounded, is that the first step to improving something is measuring it. Do not make assumptions or always be guided by intuition. Quality information on which to base both our knowledge and our business decisions is essential.

The answer to the question in this article’s title is: by digitalising. It is worth clarifying that keeping accounts in Excel, writing minutes in Word or using messaging software—the same kind we use with family and friends—is not exactly digitalisation. Digitalising your working processes through applications such as Mela, from the perspective of optimising labour, means, among other things:

- Traceability of all information produced on site—minutes, photographs, non-conformities, inspections and quality checks. All the information is in one place, easily located using different search criteria and potentially shareable with all parties.

- Control of clock-ins and hours worked, with their associated costs, as a preliminary step to analysing possible idle time or underuse of labour. Flexibility when reallocating tasks to team members, with their start and end dates, to better understand how long certain work takes and identify opportunities for improvement.

- Improve your company’s competitiveness or your work as a self-employed professional while improving your reputation and protection, because everything that has happened on site has been properly documented and you can prove it.

Perhaps a short video like this one, in which we provide an overview of the entire application, will encourage you to continue researching and ultimately become one of the many companies and self-employed professionals whose use of labour has improved (20 hours saved per person per week, a 30% reduction in errors and rework, and a reduction in deliveries of completed work or projects by 50%) after acquiring and implementing Mela as their construction management application.