A regional consortium in Piedmont has integrated Mela with its GIS system to manage work orders for the water network. Interventions are planned from the map and assigned to teams, which document their work in the app. Once closed, PDF reports are automatically generated and sent to the GIS for archiving.

Sector
water network management and maintenance
Size
operations at regional scale
People involved
operations office and site technicians
Geographical area
Piedmont
  1. 01 | THE CLIENT’S CHALLENGE

    Connect the water network map to the teams’ work

    A regional consortium in Piedmont needed to coordinate water network maintenance interventions while keeping territorial information connected to activities carried out in the field. The challenge was to manage a continuous workflow between GIS, the operations office and teams: identify where to intervene on the map, assign the work and find the documentation of the completed intervention in the geographic system.

    • Link each work order to the relevant point on the network.
    • Make the information needed to carry out and document the intervention available to teams.
    Work orders on the GIS map of the water network.
  2. 02 | OBJECTIVES

    Manage interventions from map-based planning to archiving in the GIS

    The goal was to connect territorial planning with operational management, accompanying each work order from assignment to closure.

    • Plan interventions from the GIS map.
    • Assign work orders to teams.
    • Enable technicians to document activities directly from the app.
    • Generate PDF reports when interventions are closed.
    • Automatically send reports to the GIS for archiving.
    Connection between GIS, the operations office and field teams.
  3. 03 | THE CLIENT’S PROBLEM

    Keep the location, work order and intervention documentation connected

    To coordinate water network maintenance, the geographic reference must be accompanied by operational information and documentation of the work carried out. The consortium needed to connect these elements: from identifying the intervention on the map to assigning the team and returning the report to the GIS.

    Table
    ProblemOperational consequence
    Identify where to intervene on the networkLink the work order to the geographic reference
    Send the work to the teamsConnect office planning with field activity
    Document the work carried outCollect intervention information directly from the app
    Prepare the final reportGenerate the PDF when the work order is closed
    Store the documentation in the GISAutomatically send the report to the geographic system
  4. 04 | THE SOLUTION

    Mela and GIS connected, from the map to the final report

    The consortium integrated Mela with its GIS system to link water network work orders to team activities. Interventions are planned from the map and assigned to technicians, who use the Mela app to document the work carried out. When the intervention is closed, the PDF report is automatically generated and sent to the GIS for archiving. The documentation therefore returns to the geographic system from which planning begins.

    From GIS planning to intervention documentation with Mela.

From testing to operational use

An operational workflow connecting the network, teams and office

  1. 3 months

    Planning and assignment

    The office plans interventions from the GIS map and assigns work orders to teams.

  2. 10 days

    Execution and documentation

    Technicians carry out interventions and document their work directly in the Mela app.

  3. 3 days

    Closure and archiving

    When interventions are closed, PDF reports are generated and automatically sent to the GIS for archiving.

BENEFITS ACHIEVED

Planning and documentation connected in the same workflow

  • Interventions linked to the network

    Work orders remain linked to the geographic references of the water network.

  • Continuity between office and field

    Map-based planning is connected to work assignment and the documentation collected by teams.

  • Documentation directly from the app

    Technicians record the work carried out through Mela, adding to the intervention report.

  • Reports automatically archived in the GIS

    When the intervention is closed, PDFs are generated and sent to the geographic system, eliminating the manual transfer of reports.

Results reported by the organisation

2 connected systems
GIS and Mela integrated to connect territorial information and field activities.
3 connected stages
Planning, execution and documentation archiving.
1 app for teams
Technicians document their work directly in the Mela app.
0 Manual uploads of reports to the GIS
When the intervention is closed, PDF reports are generated and sent automatically.

Ask Mela Brain

What is the challenge on your site?

AI recommends the Mela features that are right for you.

Discover how Mela can help

FAQ

Frequently asked questions about the construction site management app

What is Mela and who is it for?

Mela is the AI app for construction site management: one tool for daily reports, minutes, progress reports, safety and cost control. It is designed for construction companies, installers, general contractors and site supervisors managing one or more sites.

Download · iOS and Android app

Download the Mela construction site management app

Available for iOS and Android · Take Mela with you on site.

Download on the App StoreGet it on Google Play