How to prepare a construction quote for RL, CSP and CSE activities
Learn how to prepare a fair construction quote for RL, CSP and CSE activities, with cost items, responsibilities and a practical Excel template.
How to prepare a construction quote for RL, CSP and CSE activities. Together with Dr Adriano Ciani, we examine quote templates with all the cost items to consider for a fair, well-informed offer. Attached you will find a pre-filled Excel file that can be quickly updated with all your duties and costs.
How to prepare a construction quote for CSP, CSE and RL
It was August 2006 when Decree Law no. 223, better known as the Bersani Law, abolished minimum fees for engineers, architects, surveyors and technical experts.
From that point onwards, an unusual market developed, with offers for technical services reduced so drastically that they sometimes no longer represented fair remuneration for the assignment undertaken. It became a market without rules in which, despite the responsibilities established by law, the Technician’s role was devalued in favour of the lowest price, to the detriment of quality.
Result: an increase in disputes and public spending!
So much so that in June 2016, the relevant Ministers took action by approving the decree containing “the remuneration tables”, proportionate to the quality level of design services and activities and to the activities referred to in Article 31, paragraph 8, of Legislative Decree 18 April 2016, no. 50, concerning the “Public Contracts Code”, since Public Administrations were no longer even able to assess the fee to be used as the tender starting price for service contracts.
But minimum fees remain abolished to this day, both in the public and private sectors
How to prepare a construction quote for RL, CSP and CSE: correctly pricing the offer
Let us come to the heart of today’s topic: how to price your financial offer quickly, but above all on an informed basis, in relation to the obligations under Articles 90, 91 and 92 of Legislative Decree 81/08 and subsequent amendments, for the activities of RL – Responsabile dei Lavori (person responsible for the works), CSP – Design Coordinator, and CSE – Execution Coordinator.
In this regard, Dr Adriano Ciani provided us with a useful Excel-based digital tool for related services lasting up to 13 months
How to complete the construction quote for RL, CSE and CSP
- Download the Excel file to complete your construction quote
- The file lists, chronologically across the different sheets, the duties to be carried out
- By completing the areas highlighted in green, you can then quantify the direct costs you will incur and establish fair remuneration, meaning the best offer to formalise with the Client
- The Excel sheet is able to create its own / customised company cost parameters
Quote for the Design-phase Coordinator
In summary, the CSP must draw up/prepare:
The initial information - PI (only for Public Works).
Assessment of the risks posed by unexploded ordnance with a preliminary study – VOB (only for works involving excavation).
The Safety and Coordination Plan (PSC), including the Layout, Estimate of Safety Costs, Programme, Labour Incidence and Operational Technical Sheets.
The File containing the Characteristics of the Work – FdO (not for ordinary maintenance works)
Work with the Designer to align the PSC with the Executive Project (Progetto Esecutivo).
Quote for the Execution-phase Coordinator:
The CSE must carry out the following activities:
- Check the PSC drawn up by another CSP and/or, where necessary, make amendments to the PSC, the FDO and the ETC (where applicable, namely in the case of roofing works)
- Carry out periodic inspections/site visits
- Check the Operational Safety Plan (POS) of the Appointed Contractor and verify that the POSs of the Executing/Subcontracting Companies are consistent with that of the Appointed Contractor and with the current PSC
- Provide consultancy to the Responsabile dei Lavori (person responsible for the works) (if requested under the assignment)
Quote for the Responsabile dei Lavori (person responsible for the works): activities to be priced
In summary, the Responsabile dei Lavori (person responsible for the works) must:
- Carry out the verification of the professional and technical requirements of the Appointed Contractor and Executing Subcontracting Companies, whether or not subcontractors, as well as Self-Employed Workers – L.A. on site;
- Prepare and submit the Preliminary Notice and related updates within the statutory deadlines.
- Fulfil the requirements set out in Articles 90, 93, 99 and 101 and Annex XVII of Legislative Decree 81/08 and subsequent amendments.
Other expenses to consider when preparing a quote
How do you prepare a construction quote? As we have seen, the activities of the CSP, CSE and RL are specialist technical activities involving significant responsibility and are therefore all subject to general practice expenses, such as insurance policies:
- Professional indemnity insurance (mandatory)
- Legal protection (optional)
- Contractual expenses
- Office operational support services
- Notarial expenses for establishing an RTP (professional grouping)