The technical roof document, or ETC, is the document containing the design and technical specifications and the certificates of conformity required to prevent and protect people carrying out work on roofs from the risk of falls from height. With the help of Dr Adriano Ciani, owner of Studio Tecnico Specialistico Ciani Consulenti in Udine, let us look at what it is and how to prepare it effectively.

Technical Roof Document (ETC)

The ETC (the Italian Elaborato Tecnico della Copertura, meaning “Technical Roof Document”) is prepared pursuant to Legislative Decree 81/08 and subsequent amendments.

It defines the preventive and protective measures (MPP) to be provided for in the design and then adopted when carrying out building work where there are risks of falls from height on the roofs of private or public buildings. Its purpose is to ensure safe movement, access and execution of work on the roof, including maintenance, inspection, repair and/or the subsequent installation of systems.

Who prepares and updates the ETC? Rules governing the Italian Elaborato Tecnico della Copertura are regional and must be checked for the location of the works. As an institutional reference, Tuscany Regulation 75/R, Article 5 assigns preparation during design to the design-stage safety coordinator (CSP), where required, or otherwise to the works designer; updating and completion by the end of the works are assigned to the execution-stage safety coordinator (CSE), or to the works director where no CSE is required. Manufacturers, installers and other professionals provide declarations and certificates for their respective areas of responsibility, but they do not automatically replace the professional responsible for the ETC. Article 6 also governs certification, delivery and subsequent availability of the document.

Technical Roof Document (ETC): what does it consist of during the design phase?

a. Technical Design Report

The Technical Design Report must specify:

  • the Client, and the subject of the work,
  • the characteristics of the roof,
  • the routes providing access to the roof,
  • the access points to the roof, together with any reasons why permanent (fixed) access cannot be provided and auxiliary (removable) access is required,
  • movement and execution of work (including standing areas) on the roof,
  • the type of protective equipment to be used against falls from height, selected in accordance with how the work will be carried out,
  • safety signage,
  • the type of design, namely fall restraint or fall arrest (in the latter case, specifying emergency measures for recovering a worker after a fall), and the resulting PPE,
  • references to the attached drawings.

b. One or more Roof Plans

The plan must be at an appropriate scale and show the configuration of the anchorage system to be adopted on the roof, namely the fixed preventive and protective measures provided as part of the structure. The following must be highlighted graphically:

  • the route,
  • the access point,
  • the fixed prevention and protection systems provided, namely structural anchorages (plates and screws),
  • the anchorage points (safety hooks),
  • the anchorage lines (lifelines and related accessories) or other fixed protective measures on the roof, such as protective nets for rooflights, perimeter guardrails and safety ladders,
  • a summary key showing the symbols used.

A PDF file designed by Dr Ciani is attached below as a useful example for preparing a correct Technical Design Report.

As regards the plan, especially if you are doing this for the first time, we recommend consulting the various qualified manufacturers in the sector so that you can obtain guidance with an optimised quality/safety/cost ratio

It will consist of a graphic diagram and a quotation, useful for your design and for completing the estimate of the safety costs in the PSC. There are also several software solutions on the market that provide practical assistance with this specialist design work.

Technical Roof Document (ETC): what does it consist of during the execution phase?

a. In the event of variations: an update to the Roof Plan(s)

The roof plan will provide a precise graphic representation of the anchorage system installed (as built), followed by a corresponding update to the Technical Design Report. If there are no variations, the document prepared during the design phase remains valid.

These data must be incorporated by the CSE, where appointed, into Sheet II-2 of the File containing the characteristics of the structure (FdO), referred to in Annex XVI of Legislative Decree 81/08 and subsequent amendments.

b. Documentation certifying that the structure is suitable for the stresses arising from the designed anchorage system,

namely the structural anchorages (plates and screws), anchorage points (safety hooks), anchorage lines (lifelines and related accessories) or other fixed protective measures on the roof.

c. The Manufacturer’s Certification

for the anchorage system supplied, in accordance with the technical standards in force.

d. The installer’s declaration

The declaration certifies the correct installation of the designed anchorage system installed, and therefore compliance with good technical practice and with the Manufacturer’s instructions and those of the CSP/CSE and/or the Works Designer. It is always advisable to require a qualified installer, meaning one with specifically trained personnel, as well as suitable equipment/instruments and specific insurance cover.

e. The operating and maintenance manual and the maintenance programme for the anchorage system supplied and installed

that is, the fixed preventive and protective measures installed on the roof, whose details must be incorporated by the CSE, where appointed, into Sheet II-3 of the File containing the characteristics of the structure (FdO), referred to in Annex XVI of Legislative Decree 81/08 and subsequent amendments.

The Technical Roof Document during the design phase

The ETC during the design phase is completed before work begins by the CSP and/or Works Designer and delivered to the Client for the related legal obligations.

It must therefore form part of the documents filed with the local authority to obtain the relevant authorisation, as well as the safety documents filed on site, such as the PSC, FdO and POS of the appointed contractor.

The Technical Roof Document during the execution phase

Under the cited Tuscan reference, the ETC is updated and completed by the end of the works by the CSE, or by the works director where no CSE is required. The manufacturer and installer provide the certificates, declarations and instructions relating to the components and activities within their respective responsibility. The complete document is delivered to the owner or the person responsible for managing and maintaining the building in accordance with the applicable rules.

The measures designed in the ETC must at least comply with the provisions of Articles 15, 111 and 115 of Legislative Decree 81/2008 and subsequent amendments.

Therefore, to prepare the ETC appropriately during the design phase, it is worth remembering that there are relevant UNI standards that can provide the Technician with suitable guidelines for configuring anchorage systems and PPE on the roof, and for their proper use against falls from height, for example:

- UNI 11560:2014 relating to permanent roof anchorage systems may provide

- UNI EN 795:2012, UNI CEN/TS 16415 2013 and UNI 11578 2015, UNI EN 517 for anchorage lines and anchorage devices,

- UNI EN 361,355, 360, 353-1, 353-2, 354, 358, 362, 397 for Personal Protective Equipment against falls from height.

- UNI EN 516 for walkways or gangways/walking surfaces for the movement of people and materials.

- UNI EN 12464-1 and UNI EN 12464-2, for lighting routes in conditions of poor or no natural lighting.

In addition, many Italian Regions have now approved/adopted special laws, supplementary to Legislative Decree 81/08 and subsequent amendments, which may themselves be considered excellent guidelines.

By way of example, and not as an exhaustive list, these include Tuscany, Friuli Venezia Giulia, Veneto, Lombardy, Emilia-Romagna and Trentino-Alto Adige.

Penalties are those provided for in Legislative Decree 81/08 and subsequent amendments, Articles 157, 158, 159, in addition to those provided for where the Special Regional Laws and the Criminal Code apply, in the event of a serious or fatal accident.

Technical Roof Document (ETC): conclusions

The introduction of the ETC entails a more considered and specialist design of the preventive and protective measures provided as part of the structure, namely fixed measures, as well as greater involvement by the Client and the Appointed Contractor/Main Contractor in relation to contract work carried out on the roof.

This results in improved safety performance against the risk of falls from height, which, as a reminder, accounts for most fatal accidents on Italian construction sites, and therefore in proceedings involving the Client, the Works Supervisor, the Safety Coordinator for the Employers and the Appointed Contractor’s Supervisors.