Digitalisation of public contracts: key developments in a few minutes

Technological and regulatory developments in the public-contracts sector have brought about significant change through digitalisation. Our article provides a quick overview of the latest innovations. Discover how these developments promote efficiency, transparency and modernisation throughout the public-contracts lifecycle, anticipating a more agile and digitally oriented future for public governance.

Digital transition and the new public-contracts code: what are the key developments

Contents:

Introduction to the digital transition of public contracts

With the new public-contracts code (dgls 36/23), we are witnessing a genuine digital revolution in public contracts.

The new public-contracts code is aimed at simplifying procedures and increasing transparency and efficiency. In this article, we will explore the main developments, examining in detail the key role of digital procurement platforms, the mandatory FVOE (the virtual file of the economic operator), and the introduction of the mandatory BIM model from 1° January 2025.

Public contracts and digitalisation in 2024

Following publication of the new public-contracts code (dgls 36/23) in March 2023, it became fully applicable from 1 January 2024.

Against this background, it is useful to examine one of the most important developments introduced by the new dgls 36/23: the digitalisation of public contracts.

Public procurement is undergoing radical change through the integration of several key components. Introduced by the new code, these innovations are intended to transform the management of and participation in public tenders within an increasingly sophisticated digital environment.

Let us look at what this involves in detail.

2-Digital procurement and e-procurement

Platforms supporting digitalisation

Digital transformation in public contracts takes place primarily within the national digital procurement ecosystem (e-procurement), an ambitious, centralised concept introduced by the new public-contracts code. This system represents an interconnected network of digital platforms and services designed to guide and facilitate the entire public-contracts lifecycle.

Let us examine what the relevant articles of the new public-contracts code say about this subject:

Art. 21. (Digital lifecycle of public contracts)

1. As a rule, the digital lifecycle of public contracts consists of planning, design, publication, award and execution.

2. Activities relating to the lifecycle referred to in paragraph 1 are managed, in compliance with the provisions of the Italian Digital Administration Code, referred to in legislative decree 7 March 2005, no. 82, through interoperable digital platforms and services, as indicated in Article 22.

3. Parties involved in the digital lifecycle of public contracts operate in accordance with this Part and, when initiating the procedure, act in accordance with the provisions of the code referred to in legislative decree no. 82 of 2005 and Article 3 of Law 13 August 2010, no. 136.

This article shows that the regulatory framework provided by the new public-contracts code, clearly sets out the objective of moving public contracts into the digital age.

The national digital procurement system acts as the integration and control hub for the entire ecosystem. Digital procurement platforms work together to facilitate the real-time exchange of data and information. This interconnection supports smoother management and a complete view of the contractual lifecycle, ensuring greater transparency and efficiency.

What are the objectives of digital procurement platforms?

Digital procurement platforms within the national e-procurement ecosystem are primarily intended to digitalise the entire public-contracts procedure. This process is based on acquiring data and creating digital-native documents, moving beyond the outdated use of paper forms and catalogues. The aim is not only to simplify operations but also to improve interaction with existing databases, continuously enriching the system with new data generated by individual procedures.

Digital activities through the platforms

Article 22 of the Code, in paragraphs 1,2 provides a detailed overview of the activities that digital procurement platforms must manage.

Let us look at them together:

Art. 22. (National digital procurement ecosystem (e-procurement))

1. The national digital procurement ecosystem consists of the infrastructural digital platforms and services enabling management of the public-contracts lifecycle, referred to in Article 23, and the digital procurement platforms used by contracting authorities, referred to in Article 25.

2. The digital platforms and services referred to in paragraph 1 allow, in particular:

a) the drafting or acquisition of documents in digital-native format;
b) the publication and transmission of data and documents to the National Public Contracts Database;
c) electronic access to tender documentation;
d) submission of the European Single Procurement Document in digital format and interoperability with the virtual file of the economic operator;
e) submission of tenders;
f) the opening, management and digital preservation of the tender file;
g) technical, accounting and administrative control of contracts, including during execution, and management of guarantees.

3. Databases of national interest contribute data to the national digital procurement ecosystem pursuant to Article 60 of the Italian Digital Administration Code, referred to in legislative decree 7 March 2005, no. 82.

This means that the essential role of digital procurement platforms will be to include the drafting or acquisition of documents in digital format, the publication and transmission of data to the National Public Contracts Database (BDNCP), and the provision of electronic access to tender documentation.

In summary, the national e-procurement ecosystem embodies the new public-contracts code’s vision of a fully digitalised, interoperable and efficient contractual approach.

Who must use digital procurement platforms?

As described in Article 25 of the new public-contracts code, contracting authorities and concession-granting bodies must use these platforms, following specific technical rules without altering operators’ equal access.

Digital procurement platforms must interact with the National Public Contracts Database and the National Digital Data Platform, ensuring smooth integration with the services provided for by the Italian Digital Administration Code. Contracting authorities and concession-granting bodies without their own digital platform may use those provided by other entities, central purchasing bodies or aggregating entities, provided that a system operator guarantees their operation and security.

The introduction of digital procurement platforms is a fundamental step towards modernising and improving efficiency in public-procurement processes.

This digital procurement system is just one of the developments introduced by the new public-contracts code 2023. There are other important innovations concerning the digitalisation of public contracts. The other major development concerns the FVOE, the virtual file of the economic operator.

3-The virtual file of the economic operator (FVOE)

The virtual file of the economic operator is another major development introduced by the new public-contracts code, replacing the previous AVCPass.

Let us examine each aspect of this change, which can simplify and optimise the entire contractual process.

What does the virtual file of the economic operator represent?

The FVOE is an essential element, bringing together all the information required for economic operators to participate in public tenders. It supersedes the traditional AVCPass and introduces automated, continuous verification of requirements, making it a crucial prerequisite for accessing tenders.

How does the FVOE work?

The FVOE is designed to be simple and efficient. Through a web interface integrated with certified bodies, economic operators can easily upload the required documents. Contracting authorities, meanwhile, can quickly verify an economic operator’s eligibility to participate in tenders.

The main difference from the previous AVCpass is efficiency. The FVOE represents a qualitative leap, introducing substantial improvements. Continuous verification of requirements extends beyond the award stage, while the list of economic operators already verified greatly simplifies participation in multiple tenders. This innovative system aims to reduce duplicated certificates and optimise the overall efficiency of the process.

What are the FVOE’s main developments and features?

-Automated continuous verification of requirements: the FVOE introduces an automated system for continuously verifying economic operators’ requirements. This ensures that operators consistently maintain the requirements needed to participate in public tenders.

-Removal of duplicated certificates: the FVOE’s key innovation is eliminating duplicated certificates. Economic operators already verified are included in the list, simplifying participation in different tenders without repeating the verification procedure.

-Interoperability: one of the FVOE’s main features is interoperability. This allows contracting authorities to use checks already carried out by other authorities, thereby reducing bureaucracy.

-Real-time eligibility checks: through automation and digitalisation, the FVOE allows contracting authorities to verify economic operators’ eligibility in real time. This accelerates assessment and helps make operations more efficient.

-Regulation through ANAC resolution 262: the ANAC resolution 262 provides detailed guidance on regulating and implementing the FVOE. It establishes clear rules and procedures to ensure compliance and transparency in public-tender participation.

These features effectively combine modernisation and simplification in public tendering, benefiting economic operators and contracting authorities.

4- BIM: Building Information Modelling

The importance of building information modelling (BIM) in new public contracts

Another important development concerns BIM technology (building information modelling), which plays a central role under the new public-contracts code, as established by Article 43 of Italian Legislative Decree 36/23, which states:

Art. 43. (Digital information-management methods and tools for construction)

1. From 1° January 2025, contracting authorities and concession-granting bodies shall adopt digital information-management methods and tools for the design and construction of new works and for work on existing buildings where the tender-base amount exceeds 1 million euros. The first sentence does not apply to ordinary and extraordinary maintenance, unless it concerns works previously carried out using those methods and tools.

2. Outside the cases referred to in paragraph 1, and in accordance with the principles in Article 19, contracting authorities and concession-granting bodies may adopt digital information-management methods and tools, potentially including an award criterion in the tender documentation relating to how those methods and tools are used. This option is subject to adopting the measures established in Annex I.9, referred to in paragraph 4.

3. The tools referred to in paragraphs 1 and 2 use interoperable platforms through open, non-proprietary formats, so as not to restrict competition between technology suppliers or the involvement of specific designs by designers, and to enable data transfer between public administrations and economic operators participating in the procedure, successful bidders or parties appointed to perform the contract.

4. Annex I.9 defines:

a) measures relating to staff training, tools and the necessary organisation;
b) criteria ensuring consistent use of digital information-management methods and tools;
c) measures needed to implement information-management processes supported by information modelling, including interoperability between each contracting authority’s or concession-granting body’s asset register and the national digital archive of public works;
d) methods for exchanging and interoperating data and information;
e) applicable national and international technical specifications;
f) the minimum content of the information brief for using digital information-management methods and tools.

This section explores the importance of BIM in public procedures, considering the key aspects of this development.

The new public-contracts code aims to make full use of the benefits offered by BIM methodology to protect public investment and increase efficiency.

But what are the crucial aspects of this important development, and what does this article specifically say?

Let us look at them together:

-Mandatory BIM: from 1° January 2025, BIM will be mandatory for contracts worth more than 1 million euros, excluding only ordinary and extraordinary maintenance. Works previously carried out will remain subject to the BIM requirement during maintenance.

-Interoperability: the article highlights interoperability. BIM platforms must be based on open, non-proprietary formats, protecting competition and encouraging information exchange between the contracting authority and stakeholders.

-Project rationalisation: the progressive use of BIM is intended to rationalise design and verification, delivering benefits throughout the public-works lifecycle. Article 41 of the new Italian Legislative Decree 36/23 highlights BIM as a key element in construction information management.

-BIM roles and preliminary requirements: the section stresses the importance of meeting preliminary requirements, including staff training, acquiring hardware and software, and defining an organisational document.

-Annex I.9: Annex I.9 provides specific details on adopting BIM, including preliminary measures, consistency criteria, interoperability provisions and information-management methods. The document serves as a guide to ensuring correct application of BIM in public procedures.

The benefits of implementing BIM under the new public-contracts code

The introduction of the BIM requirement under the new public-contracts code, through Article 43 thereof, marks a significant turning point for Italy’s construction sector. This initiative reflects technological progress and aims to transform how public works are designed, built and managed. BIM is not merely a formal requirement, but a powerful resource for rationalising processes, improving collaboration between industry participants and optimising efficiency throughout the construction lifecycle. Its mandatory introduction for contracts exceeding one million euros shows a clear intention to adopt a digital and innovative approach, bringing Italy into line with international best practice.

The emphasis on interoperability and open formats in BIM creates opportunities for greater collaboration and competition, promoting a more efficient and transparent construction environment.

Although subject to specific requirements, contracting authorities retain some flexibility in adopting BIM, encouraging a gradual approach adapted to each project’s specific characteristics.

In conclusion, the mandatory introduction of BIM represents a significant step towards more efficient and informed management of public works in Italy. Its success will depend on collaboration, training and a willingness to embrace change, paving the way for a digitalised and sustainable construction future.

5- Conclusions

In conclusion, the introduction of digital procurement platforms (e-procurement), the virtual file of the economic operator (FVOE) and mandatory BIM represents a significant step towards complete digitalisation and efficiency in administrative processes, with the following specific objectives:

1- Through platform interoperability, promote more intelligent and transparent management of public resources, with emphasis on collaboration and eliminating redundant administrative procedures.

2-ANAC resolution 262 provides detailed guidance, establishing clear rules and procedures to ensure compliance and transparency in the full implementation of the FVOE. This regulatory instrument, in force from 1° January 2024, plays a fundamental role in guiding those involved to comply with regulatory provisions and promoting a consistent approach.

3-Integrating the BIM requirement into public contracts adds a further layer of innovation. BIM, with its focus on digitally managing information relating to the design, construction and management of public works, demonstrates a commitment to a more advanced and sustainable vision for the sector.

Against this backdrop of profound digital transformation, the public-contracts sector is moving towards a modern and collaborative future, embracing innovations that improve operational efficiency while promoting economic operators’ participation and transparency in public transactions. Digitalisation is not merely a step forward, but a fundamental catalyst for building more agile, intelligent and effective public governance.

As you can see, the digital transition has now become necessary, and keeping pace means adopting new technologies in every sector.

At MELA, we can help you begin your digital transition in construction and the building sector.

If you are interested, download our APP free of charge here!

Here are further developments in the new public-contracts code; we invite you to read the following articles: