DM 49/2018 PDF: everything you need to know in 2023

Italian Decree 7 March 2018, no. 49 (Decreto di approvazione delle linee guida sulle modalità' di svolgimento delle funzioni del direttore dei lavori e del direttore dell'esecuzione) – Approval of guidelines on how the functions of the works director and execution director are carried out. What you need to know in 2023

DM 49/2018 PDF

The regulations are precise. As provided for by DM 49 2018 – whose full text you can download below from the Official Gazette of the Italian Republic – the construction site in 2023 must digitise processes and tools.

DM 49/2018: why is adopting digital technology required?

Digital technology offers many benefits, and its adoption is required by law for several reasons.

  • First of all, digital technology makes tendering processes more transparent, efficient and cost-effective, ensuring that all information can be easily transmitted and shared between the parties involved.
  • Digital technology also makes it possible to retain files and documentation for the period required by law, ensuring their correct archiving and accessibility for any checks or inspections.
  • Another benefit of digital technology is the ability to improve the quality of the project and the work, reducing the risk of errors or omissions thanks to the precision and traceability of digital data.

In conclusion, adopting digital technology is an important step towards ensuring greater efficiency, transparency and security throughout the tendering and construction process.

All this is supported by lean, easy-to-use technology such as Mela – in one app, you can record everything that happens on site in real time, draw up minutes and automatically compile the Site Diary.

With the introduction of DM 49, the regulations prescribed digital transition during the execution of works for the first time, rather than only during the design phase (BIM).

DM 49/2018 PDF, further details: article 15

Let us now look in greater detail at the articles of DM 49/2018 that are of interest to us. First of all, article 15 of the decree establishes that works accounting must be carried out using specific electronic tools and platforms, including online platforms. Digital technology is required by law specifically to ensure authenticity, transparency and simplification, the security of the data entered and the data’s provenance from the competent parties. This is what the article says:

"Works accounting is carried out using specific electronic tools that use interoperable platforms, including online platforms, through open, non-proprietary formats, so as not to restrict competition between technology suppliers, in compliance with the provisions contained in these regulations and in Legislative Decree 7 March 2005, no. 82.

These electronic tools must be capable of ensuring the authenticity and security of the data entered and its provenance from the competent parties. If the works direction is entrusted to external professionals, the computer programmes must be accepted in advance by the RUP, which verifies their suitability and compliance with the requirements contained in these regulations.

If computerised accounting programmes are not used, a choice that must be adequately justified by the contracting authority and reported to the Authority, and in any event for the period strictly necessary for the contracting authority to adapt, records of the works and supplies must be transcribed from the measurement books into a specific register whose pages must be numbered in advance and signed by the RUP and the contractor."

DM 49/2018 PDF and the Site Diary: article 14

Article 14 of DM 49/2018 is clear and detailed about the information to be recorded daily in the Site Diary as required by law. This document is extremely important because it provides a complete overview of the execution of the work, which is essential both for the works director and the contractor. Correctly managing and completing it ensures full awareness of site progress and the activities carried out day after day.

"_The various accounting documents, prepared and kept by the works director or by the operational directors or site inspectors, if delegated by the former, which must be signed at the same time as they are completed, respecting the chronological order in which the data is entered, are:

a) the site diary, in which at least the following must be recorded for each day:

  1. the order, method and activity with which the works progress;
  2. the qualifications and number of workers employed;
  3. the technical equipment used to carry out the works;
  4. the list of supplies provided by the contractor, documented by the respective paid invoices, as well as anything else concerning the technical and financial progress of the works, including any accidents;
  5. details of circumstances and events relating to the works that may affect them, including weather and hydrometric observations, information on the nature of the ground and any details that may be useful;
  6. service instructions and service orders from the RUP and the works director;
  7. reports addressed to the RUP;
  8. official records of fact-finding or testing;
  9. objections, suspensions and resumptions of the works;
  10. duly authorised variations, modifications or additions to prices_"

DM 49/2018 PDF: in article 17, digital technology also applies to administration

Article 17 of the Decree establishes the obligation to use IT platforms for aspects of site accounting, as well as technical and administrative matters. This provision also marks an important step towards the complete digitisation of the tendering and construction process.

"Where IT tools are not used for the technical, administrative and accounting control of services pursuant to article 26, paragraph 2, which must be adequately justified by the contracting authorities and reported to the Authority, and in any event for the period strictly necessary to allow the contracting authorities to acquire the means needed for complete digitisation, service orders must be in writing and the contractor must return the orders signed to acknowledge receipt, without prejudice to any objections."

DM 49/2018 PDF: full text of the Official Gazette

DM 49/2018 and the Mela app’s solution

With the Mela app, the Site Diary is generated automatically from notes, photos, videos and voice notes recorded on site. This innovative system simplifies its preparation and also makes it easy for everyone involved in the project to consult. With Mela, you can also notarise the Site Diary on the blockchain, making it a certified document that can be relied upon in court.

Every item captured – photos, videos, screenshots, documents or audio – is certified directly in Mela, ensuring the authenticity and tamper-resistance of every piece of content. This level of security and traceability ensures that all the information collected in the Site Diary is truthful and cannot be altered over time.