DM 49 2018. How your construction site must comply with the law

The regulations are precise. Construction sites must be digitalised: to make tendering processes more transparent, efficient and cost-effective; to ensure that all information is transmitted; to retain files for the period required by law; ultimately, to achieve higher quality in the project and the work, with fewer risks throughout the process. Put like that, it sounds complicated. You will discover, however, that complying with the law and achieving all these results requires nothing more than a smartphone. Plus a dedicated app!

DM 49 2018

The Italian DM 49 2018 formalised the need to use digital methodologies in the construction system, first and foremost to solve inefficiency problems. Integrating digital systems can make tendering processes more transparent, efficient and cost-effective for the public sector, ensuring that data is transmitted and managed among all participants.

Digital tools facilitate the monitoring of work and costs, enabling compliance with planned timescales and reducing the risk of failure or changes during the works compared with the original project.

The digital process also supports the consistent sharing of information among all project participants.

DM 49 2018. The decree's digital innovations and guidelines for the works supervisor

The Decree highlights how digital transition, for several years now, has had a strong impact on every stage of the construction process, including works supervision.

Let us look at the main innovations introduced by the Decree:

Article 15 establishes the use of electronic tools for works accounting, while the subsequent Article 17 requires the use of IT tools for monitoring and supervision activities. This is a major step forward!

Until then, the digital transition in construction had been considered only during the design phase, through the use of collaborative technologies such as BIM. DM 49 establishes the use of digital tools also during the works execution phase.

With DM 49, the regulations prescribe digital transition for the first time not only during the design phase (BIM), but also during the works execution phase

Digital tools must collect information flows from site monitoring, inspection and supervision, in order to reduce their complexity.

Data can be collected using videos and photographs stored in digital archives. It is also in Article 15 that the text refers to “accounting carried out using specific electronic tools that use platforms, including online platforms”, capable of ensuring the authenticity, traceability and origin of the information entered.

The innovations introduced by DM 49 2018 must be based on improved cooperation and sharing, avoiding misunderstandings or misinterpretations

For the construction site, the digital platform is the centralised database for collecting information. The digital database makes it possible to monitor the progress of the site and costs in real time against the established works programme.

Article 17 of the Decree establishes the use of IT platforms, not only for accounting, but also for the accounting, technical and administrative aspects of the construction site.

What are the practical consequences of the requirements established by the regulations?

We have identified 5 main consequences:

  1. With a digitalised approach, we can follow the precise sequence of events and therefore ensure better process control
  2. Data archived on the sharing platform can be accessed immediately and simultaneously by all project stakeholders, even when they are not physically present on site
  3. The sharing environment enables continuous interconnection between those working in the field and the people responsible for activities, including the works supervisor and RUP
  4. Simultaneous recording of site events makes it possible to predict or identify situations involving risk or non-compliance, and to make rapid decisions
  5. Using digital tools can help ensure greater alignment between the expected quality of the work and its actual quality

The digitalisation process consists of structured and orderly digital archiving, which makes it possible to retain files for the period required by the regulations, ensuring higher project quality and fewer risks

What skills need to be developed to comply correctly with the regulations?

To have a digital construction site, professionals must also be ready to embrace digital tools and be able to collect, archive and read data in order to see the status of the works immediately and make timely decisions.

To do this, you do not need complicated management systems, but lightweight technologies that are easy to carry and use, with powerful features dedicated to the construction sector, such as the Mela app:

With Mela, all you need is a smartphone to

  • Exchange information in real time, including remotely
  • Take and share photographs, create operational accounting, site inspection reports and CSE inspection visit reports
  • Generate daily reports and the Works Register on headed paper using your logo and company details, and share them in real time by email, PEC, Messenger or WhatsApp
  • Synchronise all site activities in real time across computers, mobile phones and tablets
  • Archive all data automatically and securely with no limits on time or space
    With Mela, you reduce inefficiencies and anticipate problems

With Mela, you can also reduce construction-site delays by 50%, while tracking everything that happens in the field in real time, even remotely.

Digital tools make it possible to create an organised database for managing all information relating to the property, both in real time and in the future