Site diary: how to compile it and who compiles it. What you need to know in 2023
Learn what a construction site diary is, who compiles it and what it must contain, with digital tools and reference to the applicable Italian rules.
The site diary, who compiles it and how to prepare it properly, using digital tools and taking the applicable regulations into account.
Site diary: what you need to know in 2023
The site diary is an essential construction-site accounting document, created to carefully monitor the development of a project, both from a technical and an economic perspective.
It is essentially a detailed daily logbook, used to track and document, step by step, the work carried out at every stage and to record, step by step, the progress of the works as a whole.
The site diary provides a complete and up-to-date overview of the work in progress, enabling more effective management of the project as a whole and timely intervention when necessary.
Last but not least, the site diary provides a solid data base for assessing where we stand against the planned timescales and budget, helping us make informed decisions during the construction of a project.
The site diary makes it possible to track progress, any problems and alternative solutions to the project, as well as the resources used at every stage of the project
Site diary: what the regulations say
The regulations were introduced to bring the construction sector into line with contemporary times and needs, thereby ensuring greater control and addressing the longstanding inefficiency issues associated with outdated management and monitoring methods.
To protect everyone's interests, construction sites must ensure that the site diary is prepared and updated daily to monitor and record work progress and ensure that the progress of the works complies with the required rules and standards.
When we talk about regulations for the site diary, we are essentially referring to the Italian DM 49 2018, which establishes the mandatory nature of this tool in all sites where there is a works director, covering both the public and private sectors.
In particular, DM 49 2018 formalised the need to use digital methods in the construction system to ensure greater efficiency and the tracking of individual activities and activities as a whole.
Precisely on the basis of Article 15 of DM 49/2018, “The accounting of works is carried out using specific electronic tools that use platforms, including online platforms.” These electronic tools must be able to ensure:
- Authenticity, together with transparency and simplification
- Security of the data entered
- The provenance of that data from competent parties
DM49/2018 highlights how the digital transition now has a significant impact on every stage of the construction process, including works management
The site diary between mandatory requirements and the benefits of digital technology
- Digital technology simplifies the control of works and costs, ensuring compliance with the planned timescales and reducing the risk of failure or changes to the original project that could otherwise have been avoided.
- Digital processes promote the timely and consistent sharing of information between all project participants.
- Integrating digital systems makes public-sector procurement processes more transparent, efficient and cost-effective, ensuring data is transmitted and managed between all participants. They are also essential in the private sector for preventing errors, avoiding easily preventable waste of money and time and, ultimately, potential disputes.
Site diary: who compiles it?
During the execution of the project, it is the works director who is responsible for administrative and accounting control. The works director is the person tasked with constantly monitoring all the work carried out by preparing the accounting documents.
As we have seen, DM 49/18 – Article 15 – requires the use of digital media and standard formats to ensure that documents are authentic and to protect the data entered, specifically “specific electronic tools that use platforms, including online platforms”.
Until 2018, in fact, the digitalisation of construction was considered only at the design stage, when the use of collaborative technologies such as BIM was established. DM 49 also establishes the digital transition during the works execution stage.
The role of the works director
Under the regulations, the works director is entrusted with controlling the costs associated with carrying out the project or the works. This control takes place through the preparation—concurrently with the execution of the works—of accounting documents, which are public instruments that are legally valid in every respect. These documents are used to record the costs incurred during the execution of the works.
It is important that costs are assessed continuously and in parallel with the execution of the works. This allows the works director to issue progress reports within the timescales set out in the tender documents and contract. These reports are necessary to obtain interim payment certificates from the R.U.P. (Responsabile Unico del Procedimento, the Sole Person Responsible for the Procedure).
The works director also monitors the development of the works and provides timely instructions to ensure that they are carried out within the agreed timescales and sums.
The works director is responsible for:
1. Classifying and measuring the work carried out
2. Recording it in the site diary to keep track of everything
Site diary: what it must contain
The contents of the site diary are governed by Article 14 of DM 49/2018, which states that the following information must be included and recorded in chronological order:
- The order, methods and activities according to which the work is carried out
- The number of workers employed and their respective qualifications
- The technical equipment used
- A list of supplies provided by the contractor, accompanied by invoices
- Any documentation concerning the technical and economic progress of the works
- Details of circumstances and events that may affect the works
- Service instructions and service orders from the RUP and the Works Director
- Reports addressed to the RUP
- Reports of fact-finding activities
- Reports of tests carried out
- Documents relating to any disputes, suspensions and resumptions of the works
- Properly authorised variations and price changes
Site diary: discover easy, accessible digital technology with Mela
Mela is a mobile and web application for site diaries, fully compliant with Italian Ministerial Decree D.M. 49/2018.
Extremely easy to use, it requires no specific skills or training. It allows you to document site events using your smartphone, day after day, with ease. You can record text messages, signatures, photos, voice messages and videos, and upload reports.
With Mela, it is easy to track people, materials and services on a unified platform, connecting your smartphone to other devices such as computers and tablets. You can also generate a printable site diary with a single click and no additional effort. The report created in this way ensures the authenticity and security of the data and people involved, in compliance with the applicable laws.
With Mela, the site diary can be signed by all the parties involved and it will be notarised on the blockchain, thereby becoming a certified document that can be asserted in legal proceedings. All photos, videos, screenshots, documents and photos are certified in Mela, ensuring the authenticity and immutability of every item of content acquired.
Questions and answers
1. What is the site diary?
The Site Diary is a construction-site document—legally mandatory—in which all events and activities taking place during the construction of a project are recorded. It involves all the workers and functions as an accounting register for keeping a daily record of the progress of the site.
2. How should the site diary be compiled?
Article 14 of the new decree on works management—DM 49/2018—sets out in considerable detail what must be transcribed into the site diary every day. The elements to be recorded include the order, method and activities according to which the works progress, the qualifications and number of workers employed, and the equipment used to carry out the works.
3. Who must compile the site diary?
The site diary must be compiled by the works director. Their task is to update the document accurately and promptly and add their signature to certify the SAL—State of Progress of Works.